The following is the most ordinary straightforward stainless steel door sets, routine precautions are as follows: 1) The material thickness is recommended for 1.2 thick (the actual thickness must not be less than 1.08) 2) Required to use the vertender to close the door ...


The following is the most common straight downstream stainless steel door sets, routine precautions are as follows:


1) The material thickness is recommended for 1.2 thickness (the actual thickness is not less than 1.08)


2) It is necessary to pay attention to the vertender to close the door horizontal.


3) Pay attention to the production of the base layer must be less than about 5mm size of the door cover, ensuring enough space installation and glue.


4) The width of the doorboard is slightly smaller than the vertical width of 1-2 mm, and the receipt is beautiful.


5) The general door plate and the facade plate are not recommended to use glue to close the gum, so that the quality of the door sleeve can be inspected.


The routine stop door set is as follows, the drawbacks of this type of practice:

1) It is difficult to card when the base layer is inaccurate;


2) The size is not adjustable, and the stainless steel door cover cannot be changed when there is a change in the door of the door.


3) The operation is complex and the transportation is a variant when the size is large.




It is recommended to use the above figure, this kind of practice is a bit:

1) The base layer can be effectively resolved by structural decomposition when the base layer is inaccurate.


2) Door sleeve width can be adjusted in small range, and can adapt to changes in the site site.


3) Reduce processing difficulty and deformation risks after size decomposition.



Regular considerations are as follows:

1) The material thickness is recommended 1.5 thick (the actual thickness is not less than 1.38).


2) The doorboard width is preferably smaller than the width of the panel, so that the income will be beautiful.


3) Pay attention to the production of the base layer must be less than about 5mm size of the door cover, ensuring enough space installation and glue.


4) The general door plate and the facade plate are not recommended to use the glue closing, so that it is beautiful and inspection of the quality of the door cover.


The above nodes can effectively solve the waste of invisible area in our regular sets of construction. At the same time, the edge card can have a variety of changes, and the aesthetics can be uniform and



Representative needed for UAE, Thailand.






-------------------------------------------------------------------------------------------------------------------------

Crazy Metal:

One-stop quotation platform

Stainless steel turnkey project

Customized for design companies and metal curtain wall companies


Two zoom meetings a week to answer stainless steel knowledge. Please make an appointment in advance.

Appointment Tel: + 8618688779774, whatapp: +8618688779774, email:stella@crzmetal.com


For more information, please follow the official

Linkedin website:https://www.linkedin.com/company/crazymetal

Company website:www.crzmetal.com

-------------------------------------------------------------------------------------------------------------------------


11 views0 comments

Comments


bottom of page