Stainless steel honeycomb panel beam installation
- Crazy Metal
- Aug 9, 2020
- 1 min read
1. Draw the axis of the beam position according to the construction drawings.
2. Weld and fix the corner code according to the marking line.
3. Place the crossbeam between the two corners and fine-tune it until the in and out position is level with the vertical surface.
4. Correct the levelness and entry and exit positions.
5. Fully welded.
6. Anti-rust paint coating for two times to remove slag and rust.

Aluminum honeycomb panel application
Crazymetal, a stainless steel honeycomb panel manufacturer, has been specializing in the production of stainless steel honeycomb panels and other ceiling curtain walls for many years. The company provides design, production, installation, and after-sales service. High credibility. Provide professional engineering design team, deepen CAD drawings, installation and construction team one-stop service. Welcome to visit and negotiate on site.
Comentários